M-10001

2008/9 Schools Wikipedia Selection. Related subjects: Railway transport

The M-10001 during its record breaking coast-to-coast run at Cheyenne, Wyoming in 1934.
The M-10001 during its record breaking coast-to-coast run at Cheyenne, Wyoming in 1934.
The M-10001 at Green River, Wyoming in 1937. The locomotive has been lengthened and given a 1,200 hp (890 kW) engine by this point; also, a more slanting pilot has been fitted and the paint scheme has been altered.
The M-10001 at Green River, Wyoming in 1937. The locomotive has been lengthened and given a 1,200 hp (890 kW) engine by this point; also, a more slanting pilot has been fitted and the paint scheme has been altered.

The Union Pacific Railroad's M-10001 was a record breaking diesel-electric streamliner train built in late 1934 by Pullman-Standard with an engine from General Motors Electro-Motive Division and General Electric generator, control equipment and traction motors. It was the UP's second streamliner after the pioneering M-10000, the first equipped with a diesel engine and was a much longer train (six cars) than its three-car predecessor. All cars were articulated— trucks were shared between each car. It was delivered on October 2, 1934 and was used for display, test and record-setting runs for the next two months before being returned to Pullman-Standard for an increase in its power and capacity, following which it was placed into service as the City of Portland train.

Record-setting run

On October 22, 1934, the M-10001, still in its original 900 hp (670 kW) incarnation, set an as-yet unbroken record from coast to coast of the United States, running from Los Angeles to Grand Central Terminal in 57 hours. When placed into service as the City of Portland, the train reduced the Chicago, Illinois to Portland, Oregon schedule from 58 hours to 40 hours without any upgrades to track or other facilities.

Technical details

When built, the M-10001 was a fully articulated six-car train, 376 ft (115 m) in length, comprising a 48 ft (15 m) turret-cab power car, a Railway Post Office/baggage car, three Pullman sleeping cars, and a rounded-tail coach/buffet/observation car. It was powered by a 900 hp (670 kW) V12 version of the Winton 201-A engine, driving the first two trucks of the train.

The rebuilding lengthened the entire train to 455 feet (139 m) and seven cars. The power car had 12 ft (3.7 m) added to accommodate a larger, 1,000 hp (750 kW) V16 Winton diesel engine. The RPO/baggage car was lengthened by eight feet (2.4 m) to take a steam generator for train heating, and was followed by the addition of a diner/lounge car.

Both the 900 hp and 1,200 hp (670 and 890 kW) Winton diesels were the first of that type to be installed in a production train.

Service life

The rebuilt train was re-delivered on May 23, 1935 and after some test runs was dedicated as the first City of Portland on June 5 at the Portland Rose Festival, entering service between Portland, Oregon and Chicago the following day. It remained in that service until June 1939, when it was replaced in service by the M-10002 trainset, reassigned from the City of Los Angeles. In December, the diesel engine, generator, trucks, and the steam generator from the RPO/baggage car were removed and installed in a new carbody to become the third power unit on the CD-07 set for the City of Denver, along with the former M-10003's two power cars. The remainder of the train was stored until August 13, 1941 when it was sold for scrap.

Retrieved from " http://en.wikipedia.org/wiki/M-10001"
This Wikipedia Selection was sponsored by a UK Children's Charity, SOS Children UK , and is mainly selected from the English Wikipedia with only minor checks and changes (see www.wikipedia.org for details of authors and sources). The articles are available under the GNU Free Documentation License. See also our Disclaimer.