California Southern Railroad

2008/9 Schools Wikipedia Selection. Related subjects: Railway transport

California Southern Railroad
System map
Route map of the California Southern Railroad upon its completion in 1885.
Locale San Diego – Barstow, California
Dates of operation 1880–1889
Successor line Santa Fe Railroad;
BNSF Railway
Track gauge ft 8½  in (1,435  mm) ( standard gauge)
Headquarters National City, California

The California Southern Railroad was a subsidiary railroad of the Atchison, Topeka and Santa Fe Railway (Santa Fe) in Southern California. It was organized July 10, 1880, and chartered on October 23, 1880, to build a rail connection between what has become the city of Barstow and San Diego, California.

Construction began in National City, just south of San Diego, in 1881, and proceeded northward to the present day city of Oceanside. From there, the line turned to the northeast through Temecula Canyon, then on to the present cities of Lake Elsinore, Perris and Riverside before a connection to the Southern Pacific Railroad (SP) in Colton. Following a frog war where the SP refused to let the California Southern cross its tracks, a dispute that was resolved by court order in favour of the California Southern, construction continued northward through Cajon Pass to the present day cities of Victorville and Barstow. The line, completed on November 9, 1885, formed the western end of Santa Fe's transcontinental railroad connection to Chicago. Portions of the original line are still in use today as some of the busiest rail freight and passenger routes in the United States.

History

The California Southern was organized on July 10, 1880, as a means to connect San Diego to a connection with the Atlantic and Pacific Railroad at an as-yet undetermined point. Among the organizers were Frank Kimball, a prominent landowner and rancher from San Diego who also represented the Chamber of Commerce and the Board of City Trustees of San Diego, Kidder, Peabody & Co., one of the main financial investment companies involved in the Santa Fe, B.P. Cheney, L.G. Pratt, George B. Wilbur and Thomas Nickerson who was president of the Santa Fe. The organizers set a deadline of January 1, 1884 to complete the connection, a deadline that was later adjusted due to problems in the construction of the Atlantic and Pacific that forced it to stop at Needles, California.

The California Southern built its track northward from a point in National City, south of San Diego. The route, portions of which are still in use, connected the present day cities of National City, San Diego, Fallbrook, Temecula, Lake Elsinore, Perris, Riverside, San Bernardino, Colton, Cajon (not to be confused with El Cajon), Victorville and Barstow.

In Barstow, then known as Waterman, the California Southern would connect to another Santa Fe subsidiary, the Atlantic and Pacific Railroad. The Atlantic and Pacific was chartered in 1866 to build a railroad connection westward from Springfield, Missouri, connecting Albuquerque, New Mexico, then along the 35th parallel to the Colorado River. From there, the railroad was to continue to the Pacific Ocean following whatever proved to be the best route. The route was scheduled to be completed by July 4, 1878. However, the Southern Pacific was able to get a clause favorable to their own interests inserted into the charter:

"... the Southern Pacific Railroad ... is hereby authorized to connect with the said Atlantic and Pacific railroad formed under this act, at such point, near the boundary line of the State of California, as they shall deem most suitable for a railroad line to San Francisco."

Southern Pacific had already established a connection to Mojave, so their crews built eastward from there through Barstow (then called Waterman) to Needles, California, completing the connection across the Colorado River on August 3, 1883. The California segment was leased to the Santa Fe in August 1884, and fully acquired by the Santa Fe under foreclosure in 1897.

San Diego

California Southern's original station in San Diego.  This station was demolished and replaced in 1915 by what has come to be known as Union Station.
California Southern's original station in San Diego. This station was demolished and replaced in 1915 by what has come to be known as Union Station.

The California Southern began construction in National City on land originally acquired by Frank Kimball. The railroad's main yards and locomotive maintenance shops were located here, and until the connection was made with Barstow, all tools and equipment ordered by the railroad arrived here by ship around Cape Horn from points in the eastern United States, while the wooden ties arrived by ship from Oregon. Surveys and construction between National City and San Diego were well underway by March 1881. The railroad reached Fallbrook and opened between there and San Diego in January 1882.

In 1881 and 1882, the California Southern received ten locomotive shipments by sea at National City. The last three of these, delivered in November 1882 aboard the ship Anna Camp, have been identified as the last three locomotives ever delivered to the United States Pacific coast after traveling around Cape Horn.

Temecula Canyon

In order to connect to the Atlantic and Pacific line in the quickest way possible, surveyors and engineers for the California Southern pushed the route through Fallbrook and Temecula, bypassing what was at the time the pueblo of Los Angeles. What the railroad didn't understand was the nature of Southern California's dry washes. The local inhabitants told the railroad of the dangers of building through such an area, that it could become a raging torrent of water, but the railroad built through the canyon anyway.

Despite the warnings, track work through the canyon proceeded at a quick pace. The line was completed to Fallbrook on January 2, 1882, then to Temecula on March 27, 1882.

Many parts of the canyon had suffered storms. In February 1884 a storm hit. The train was delayed and the canyon walls brought boulders crashing down on the rails. On February 3, the train was unable to get through. A few days later, the wires were down. The train from Colton to San Diego was unable to get through. Disaster had been averted because young Charlie Howell hurried up the tracks from his family homestead near Willow Glen and somehow managed to stop the train. A series of devastating washouts on the section through Temecula Canyon occurred amid heavy rain storms that flooded the area starting on February 16, 1884, just six months after the first trains operated the entire route between San Diego and San Bernardino. The storms brought more than 40 inches (1,000 mm) of rain in a four-week period. Two thirds of the mainline through the canyon were washed out with ties seen floating as far as 80 miles (129 km) away in the ocean. Temporary track repairs were made after the first storms, but later in the month, additional rains and flooding washed out the entire route through the canyon. Repairs were estimated at nearly $320,000, a figure that could not be recouped effectively.

The canyon was finally bypassed completely with the completion of the Surf Line on August 12, 1888, and the line through the canyon was relegated to branch line status.

The crossing at Colton

Construction of the California Southern was repeatedly interrupted by Santa Fe's rival, Southern Pacific Railroad (SP). In one instance, the California Southern was to build a level junction across the SP tracks in Colton, a crossing which still exists today. California Southern engineer Fred T. Perris ordered the crossing built and acquired the track section for the railroad. When the track was delivered to National City in July 1883, SP officials hired the sheriff there to seize the track section and prevent its installation. The sheriff kept the track under 24-hour guard, but Perris's men were able to retake the track while the sheriff napped, loaded the track on a flatcar and started northward with it toward Colton, where it was to be installed.

Perris had obtained a court order on August 11, 1883, that would legally allow the California Southern to install the new track section, and his crew was ready to install it as soon as SP's Overland Mail passed the point of intersection between the two railroads. However, at that moment an SP locomotive arrived at the scene pulling a single gondola and stopped. The engineer of the SP locomotive then drove the train back and forth slowly at the crossing point in an effort to prevent the California Southern crew from installing the crossing. It was believed that the gondola held a number of SP men with rifles and other weapons who crouched below the walls of the car so as not to be seen.

Jacob Nash Victor, another California Southern construction engineer, was the foreman at Colton. In a letter that Victor wrote to Thomas Nickerson, then president of the California Southern, he stated:

"I thought it advisable to have final order of court printed and each SP employee served. It was also asserted that headquarters at San Francisco had not received the final order. The danger of a riot was so imminent, by legal advice I had the order telegraphed to the Sheriff at SF to serve on the President or Secy. ... In the meantime the Sheriff [in Colton] had organized a posse, with arms and was waiting for order of court to clear the track, on our application."
The station and yards at San Bernardino in 1915.  A year later, the station seen here was destroyed by fire.
The station and yards at San Bernardino in 1915. A year later, the station seen here was destroyed by fire.

Soon, the court's construction order was accepted by SP, the track was cleared and the crossing was installed. The first train from San Diego arrived in Colton on August 21, 1882 (before the crossing was installed), and the first train to San Bernardino arrived just over a year later on September 13, 1883.

Cajon Pass

The first structure that the California Southern used as a depot in San Bernardino was a converted boxcar. Building north from San Bernardino, the California Southern was able to piggyback on the survey work done by the Los Angeles and Independence Railway up to a point near Cajon.

The original grade of the line up the pass rose at a 2.2% slope between San Bernardino and Cajon, where the grade steepened to 3% until reaching the summit 6 miles (9.7 km) further. The route over Cajon Pass was completed with a "last spike" on November 9, 1885, and the first train to use the pass carried a load of rails southward from Barstow on November 12 to be installed near Riverside. The first through train from Chicago via Santa Fe lines arrived in San Diego on November 17, 1885.

A westbound Santa Fe train pauses at Cajon Siding to cool its braking equipment after descending the pass in March 1943.  The original station structures and facilities can be seen to the left of the train.
A westbound Santa Fe train pauses at Cajon Siding to cool its braking equipment after descending the pass in March 1943. The original station structures and facilities can be seen to the left of the train.
A Santa Fe train working through Cajon Pass in March 1943.
A Santa Fe train working through Cajon Pass in March 1943.

Construction of the original route through Cajon Pass was overseen by Victor, who by this time had become General Manager of the California Southern. He operated the first train through the pass in 1885, proclaiming "No other railroad will ever have the nerve to build through these mountains. All who follow will prefer to rent trackage from us." Victor's assertion remained true for a while as the San Pedro, Los Angeles and Salt Lake Railroad (which later became part of Union Pacific Railroad) signed an agreement to operate over the California Southern track via trackage rights on April 26, 1905, but Victor was proven wrong eighty years later when SP built the Palmdale Cutoff in 1967 at a slightly higher elevation through the pass. In honour of his work through the pass, the city of Victorville was named after Victor.

Consolidation

Santa Fe timetable from 1889 showing passenger train schedules between Chicago, Los Angeles and San Diego, using California Southern tracks from Barstow to Los Angeles and San Diego.
Santa Fe timetable from 1889 showing passenger train schedules between Chicago, Los Angeles and San Diego, using California Southern tracks from Barstow to Los Angeles and San Diego.

To reach Los Angeles, the Santa Fe leased trackage rights over the Southern Pacific from San Bernardino on November 29, 1885, at $1,200 per mile per year. Naturally, the Santa Fe sought ways to reduce the fees. On November 20, 1886, the Santa Fe incorporated the San Bernardino and Los Angeles Railway to build a rail connection between its namesake cities. California Southern track crews performed the construction work, and the first train on the new line arrived in Los Angeles on May 31, 1887. During the construction, Santa Fe officials worked to consolidate the many subsidiary railroads in Southern California in order to reduce costs. At a stockholder meeting on April 23, the eight railroads and their prominent stockholders, minus the California Southern, voted in favour of consolidation, and the California Central Railway was formed as a result on May 20, 1887. After the consolidation, although the California Southern remained a separate subsidiary, the National City shops were downgraded and the services provided there were moved to the newly constructed shops in San Bernardino. One of the first official lists of stations on the California Southern and California Central railroads published on July 13, 1887, shows the California Southern divided operationally into two divisions: the San Diego division covered the territory between National City and Colton; from there, the San Bernardino Division covered the route through Cajon Pass to Barstow.

Santa Fe's California Limited pauses at the summit of Cajon Pass in 1908.
Santa Fe's California Limited pauses at the summit of Cajon Pass in 1908.

The Santa Fe underwent a massive financial overhaul in 1889. The major investors in Boston, Massachusetts, were mostly replaced by investors from New York and London at the annual meeting on May 9. The investors replaced the company's board of directors with a new board that included George C. Magoun (who would later be linked with the company's 1893 receivership). The new investors disliked the number of subsidiary companies and sought to further consolidate them. The California Southern, California Central and Redondo Beach Railway companies were consolidated into the Southern California Railway on November 7, 1889. The Santa Fe finally purchased outright the holdings of the Southern California railroad on January 17, 1906, ending the railway's subsidiary status and making it fully a part of the Santa Fe railroad.

Company officers

Presidents of the California Southern Railroad were:

  • Benjamin Kimball 1880
  • Thomas Nickerson 1880-1885
  • George B. Wilbur 1885-1887

Visible remnants

Much of the original right-of-way graded and used by the California Southern is still in active daily use by contemporary railroad companies. Several structures originally built for or by the railroad, or in some cases the remains of these structures, can also still be seen along the line. Some of the buildings that remain are still in use in their primary purposes.

An eastbound Union Pacific Railroad train working upgrade on Cajon Pass in 1991.
An eastbound Union Pacific Railroad train working upgrade on Cajon Pass in 1991.

The two ends of the former railroad are still in use as of 2008. The section between Barstow and Riverside through Cajon Pass, which includes the disputed crossing in Colton, remains one of the busiest rail freight corridors in the United States, seeing trains of BNSF Railway and Union Pacific Railroad as well as Amtrak's daily Southwest Chief passenger train. At Cajon, the concrete pads that once served as the foundations for the railroad's station facilities and water tanks there still remain long after the buildings that were atop them have been removed. Not all of the track through Cajon Pass is in its original 1885 location. The Santa Fe made a few realignments of track through the pass during the 20th century to straighten some curves along Cajon Creek (between Cajon and San Bernardino), lower gradients for eastbound trains with the addition of a separate track through what has come to be known as Sullivan's Curve, and to reduce some curvatures and lower the pass's overall summit elevation by 50  ft (15  m).

The maintenance shops in San Bernardino are still in use by BNSF Railway, although not to the extent that they were used in the 20th century. The San Bernardino station that was opened by the California Southern was destroyed by fire on November 16, 1916. It was replaced in 1918 by the Santa Fe with the current structure that now serves Metrolink's San Bernardino Line commuter trains on runs that terminate at Los Angeles Union Station. Limited service from San Bernardino to Riverside is provided by some San Bernardino Line trains, and the Metrolink Riverside Line terminates at the Riverside station although it reaches the station via a more southerly route. South of Riverside, the track is still in place to Perris, where the Orange Empire Railway Museum resides with a connection to the mainline.

A southbound Pacific Surfliner train in 2005 at Carlsbad, south of Oceanside.
A southbound Pacific Surfliner train in 2005 at Carlsbad, south of Oceanside.

At the southern end, the section between San Diego and Oceanside also sees heavy use by Amtrak California's Pacific Surfliner trains as well as those of the San Diego Coaster. As part of the Santa Fe's rail network, it was part of what has come to be known as the Surf Line; as of January 2006, this line is the second busiest passenger rail line in the United States.

Although San Diego's Union Station replaced the railroad's original station there in 1915, the California Southern's station and office building in National City has been preserved and is listed on the National Register of Historic Places.

Retrieved from " http://en.wikipedia.org/wiki/California_Southern_Railroad"
This Wikipedia DVD Selection has a sponsor: SOS Children , and is mainly selected from the English Wikipedia with only minor checks and changes (see www.wikipedia.org for details of authors and sources). The articles are available under the GNU Free Documentation License. See also our Disclaimer.